SiteStak for Carmac Building & Civil Engineering
Carmac Building and Civil Engineering Ltd is a construction company, specialising in building roads, bridges, rail networks and other civil engineering projects. The company was founded in 1984 and they have been operating continuously since then.
In order to keep up with their growing business needs, Carmac recently invested in The SiteStak System. As part of an ongoing commitment to improved processes and safer working practices on-site, they chose to adopt our system across many of their sites. As well as minimising materials storage space requirements, the system makes it easy for employees to access the materials they need quickly and easily.
SiteStak is purpose-built for drainage material storage, providing a safe and organised centralised location. With a large compartment for storing lengths of drainage pipe and smaller sections for fittings and bends, SiteStak can hold enough underground drainage for a full day's work.
More case studies
Next-level tidiness for Norcon Construction
Norcon Construction have their on-site storage of plastic drainage pipework and fittings managed efficiently with SiteStak.
Frost is the outlet of choice at Kodak for Carey London
As part of our ongoing partnership with Carey London, Frost outlets were first choice at the Kodak, Harrow development for L&Q.
Tidier and safer building sites for Landmark Ltd
Based in Surrey, groundwork and civil engineering company Landmark Ltd works on industrial and domestic projects for the private and commercial sectors.