flori construction site high wycombe with drainfast truck
Case Study

Flori Construction: Keeping Projects Moving with Drainfast

Flori Construction relies on Drainfast for fast, reliable drainage supplies that help keep its projects moving and site teams working.
Client

Flori Construction Ltd

Location

662 High Rd, London, N12 0NL

Solutions

Drainfast

Watch Drainfast Review | Why Flori Construction Choose Drainfast for Drainage Supplies on YouTube.

Working on behalf of the Trust and main contractor MTX at High Wycombe Hospital, Flori Construction requires a wide range of drainage products throughout the project. From attenuation tanks and underground drainage to road gullies and yard gullies, Project Manager Frank estimates that around 99% of the drainage materials they use are supplied by Drainfast.

For Frank, choosing a supplier is about more than getting the best price. When there are teams on site waiting for materials, delays can quickly become more expensive than any saving made on the products themselves. Drainfast’s fast deliveries help minimise downtime, while responsive customer service and the ability to speak directly to the team make ordering and enquiries straightforward.

Frank has continued to use Drainfast throughout his career, setting up accounts when moving between contractors. For him, the combination of speedy service, competitive pricing, helpful people and a network of depots makes Drainfast a supplier he is happy to recommend.

It’s not just about the price all the time. It’s about having the product delivered faster. With Drainfast, this is where the speed comes in. Instead of accumulating costs, they’re actually reducing the cost for me.

Frank Fikaj, Project Manager, Flori Construction

More case studies

Delivery options

Enter your postcode for delivery timescales, accurate stock levels, and your nearest depot