Brandwells Construction SiteStak Workstation
Case study Case Study

Brandwells Construction bring SiteStak to the Bristol area

Bristol-based groundworks and building firm, Brandwells Construction have proved the benefits of using SiteStak to store their drainage materials on site.
Builder
Client

Brandwells Construction Co. Ltd

Location
Location

Bristol, BS5 7AG

Bulb
Solutions

SiteStak

Brandwells Construction Co SiteStak Workstation

When Brandwells Construction was preparing for work on Ladden Garden Village in Yate, Bristol, they had already proved the benefits of using SiteStak to store drainage materials. With 2,450 homes, two schools, a nursing home to be built, and the necessary infrastructure, they decided to invest in four SiteStak workstations for this project alone.

The SiteStak workstation provides centralised, clean storage for pipes and components, preventing them from being mislaid, damaged, or creating a trip hazard. It also provides a mobile workstation for cutting and assembling pipe sections.

The success of this system can be summed up in the words of those who use it:

After the successful trial of the SiteStak System on 3 of our sites, Brandwells have placed another order for further units to be deployed across the business. The system is a great storage solution that also reduces the risk of slips, trips & falls, saves time looking for fittings, reduces waste and reduces plant movements.

Michael Brennan, Health & Safety Manager, Brandwells Construction

We are very happy with the results of our trials with the SiteStak system, it is proving to be very popular with the guys on site, and there is no better endorsement than that!

Chris Dowden, Managing Director, Brandwells Construction

When we’re ready to install the plot drainage we simply move the SiteStak to where we are working with the forks. Straight away it’s like a mini drainage compound right there. Fantastic pieces of kit.

Groundworker, Brandwells Construction

The SiteStak’s are the best thing that we have ever done for the guys on site, it has helped with their motivation as much as anything.

Site Manager, Brandwells Construction

More case studies

Truck Delivery options

Enter your postcode for delivery timescales, accurate stock levels, and your nearest depot