C3 Construction SiteStak System Delivery
Case study Case Study

C3 Construction invests in drainage material management

Leicester groundwork and civil engineering firm C3 Construction Ltd chose a bright orange paint scheme for their SiteStak workstations to ensure they stand out.
Builder
Client

C3 Construction

Location
Location

Tudorgate, LE8 6EP

Bulb
Solutions

SiteStak

C3 Construction SiteStak moving with excavator forks

When choosing their SiteStak storage system, Leicester groundwork and civil engineering contractors C3 Construction Ltd chose a bright orange paint scheme to make sure it would stand out on site.

The SiteStak system combines mobile construction site storage for groundworks pipes and fittings with a handy workstation where pipe can be cut and prepared for installation.

This brings many benefits for the contractor:

  • Less damage – products are protected from damage by plant machinery
  • Less waste – surplus fittings are returned to a central store for later use rather than discarded around the site
  • Less risk – storing materials properly reduces the risk of trip hazards.