Forging a strong relationship with O'Halloran & O'Brien
O'Halloran & O'Brien
Gravesend, DA12 2FL
Visit site
Drainfast / MuckStopper / SiteStak
Roads and sewers are typically installed early in a building project. This leaves the deep drainage susceptible to the ingress of silt and mud. To tackle this widespread issue, we have developed a new product, the MuckStopper 600m. This acts as a secondary manhole cover that is completely watertight and therefore prevents any silt or debris from entering the manhole below. Our prototype product was installed at an O'Halloran & O'Brien project in Godalming, and you can see how it performed in this video.
To supplement their range of earthmoving and excavating plant, they have invested in four SiteStak units. Each of these innovative mobile units combines sufficient storage of plastic pipework and fittings for at least a day’s worth of continuous drainage installation with a convenient workstation where pipes can be cut and prepared cleanly and safely. They can also be easily moved to, from and around a site as work progresses, ensuring they are strategically located for maximum work efficiency.
More case studies
Leading the way with Leeds-based Howard Civil Engineering
Based in Leeds, Howard Civil Engineering pride themselves on their high standards of work, excellent reputation and the quality of their work.
Staffordshire-based Chasetown Civil Engineering invest in SiteStak
For over 45 years, Chasetown Civil Engineering has provided expertise in civil, infrastructure, earthworks and groundworks services to housebuilding clients.
M&J Evans Construction keep their sites tidy with SiteStak
For over 20 years, M&J Evans Construction Ltd has been delivering projects nationwide. They are a family-run company with a reputation for excellence.