Getjar choose Frost balcony outlets
Getjar Limited
Plaistow Hub, Plaistow, London Road, London E13 0DN
Visit site
Frost
About Plaistow Hub
The Plaistow Hub, E13 is a large project providing 182 new homes and a new library, gym, supermarket and cafes. This is split between two buildings ranging from 15 to 23 floors. Over 200 Frost outlets were installed on this project with the majority being balcony outlets. Other types of outlets were used to suit cold roof applications and parapets. Frost worked with the architect and engineers to provide the best solution for the drainage outlets.
More case studies
Forging a strong relationship with O'Halloran & O'Brien
B&T Plant Hire, a division of O'Halloran and O'Brien (OHOB), provides groundworks and civils plant hire across South East England.
M&J Evans Construction adopt the MuckStopper system
When the roads and sewers team from M&J Evans Construction Ltd (North West) began work at a 400-unit Taylor Wimpey development site in David Whitby Way in Crewe, they knew the extended period of the development project would present challenges in terms of keeping manholes and road gullies free of silt.
C3 Construction invests in drainage material management
Leicester groundwork and civil engineering firm C3 Construction Ltd chose a bright orange paint scheme for their SiteStak workstations to ensure they stand out.